• Cytiva (Miami, FL)
    …design transfer to the Global Supply Chain. They manage and execute change order implementation, supporting cross-functional teams in addressing complex issues ... position.What you will do:Serve as a key stakeholder in Change Control Boards, advising on engineering and...stakeholder in Change Control Boards, advising on engineering and manufacturing change requests, evaluations, risk… more
    JobGet (06/15/25)
    - Save Job - Related Jobs - Block Source
  • Manager, Engineering

    Tecomet (Bristol, PA)
    …full production and on-going support. + Responsible for site change control system, including Engineering Change Order and Process Change Order ... **MANAGER, ENGINEERING ** The Engineering Manager will report...welding, and CNC machining. We are looking for a change maker. **Principle Responsibilities** + Serves as a member… more
    Tecomet (04/23/25)
    - Save Job - Related Jobs - Block Source
  • Engineering Project Coordinator

    Advanced Energy (Eden Prairie, MN)
    …people are expeditiously advised of changes to materials + Work implementation dates on Engineering Change Order (ECO) to meet design needs and minimize ... with planners and material program managers. + Assist Design Engineering (DE) to process change orders in the Enterprise Resource Planning- IPRO (ERP) system.… more
    Advanced Energy (05/31/25)
    - Save Job - Related Jobs - Block Source
  • Manufacturing Engineering I

    SCRAM Systems (Littleton, CO)
    …SOPs, work instructions, preventative maintenance, and troubleshooting guides. + Contribute to the Engineering Change Order (ECO) process. + Translate field ... Manufacturing Engineer I, you will collaborate with cross-functional teams including engineering , production, quality, and supply chain to support the design,… more
    SCRAM Systems (05/21/25)
    - Save Job - Related Jobs - Block Source
  • Senior Laser Development Engineer…

    Teledyne (Bozeman, MT)
    …Product Introduction Process + Oversee Configuration Management System + Familiar with standard Engineering Change Order Processes + Develop and mentor ... design trades and analyses on development projects. Some mechanical engineering skills required, relating to military-grade opto-mechanical systems. **Duties and… more
    Teledyne (06/03/25)
    - Save Job - Related Jobs - Block Source
  • Senior Designer

    Pentair (Manitowoc, WI)
    Engineering documents such as Engineering Change Request's (ECR's), Engineering Change Order / Engineering Change Notice's (ECO/ECN's), ... with prototyping, to working with a cross-functional team in order to drive an idea from concept to production....product structure in business ERP systems, and manage the Engineering Change processes. + Assist a degreed… more
    Pentair (06/08/25)
    - Save Job - Related Jobs - Block Source
  • Inspection C - Quality Inspector

    L3Harris (Gardena, CA)
    …to the assembly for correct part number, drawing, revision, as-required approval(s), and Engineering Change Order (s). + Perform visual inspection of ... Rework documentation, test data, etc. + Verify assembly work order test results for completeness and correctness to the...able to interpret/ follow documents such as: Drawings, Procedures, Engineering Change (EOs) Work Orders and Work… more
    L3Harris (06/06/25)
    - Save Job - Related Jobs - Block Source
  • Manager V, Product Line Management - (M5)

    Applied Materials (Santa Clara, CA)
    change management (PCM) and control** + Unreleased product approval and control + ECO ( Engineering Change Order ) approval + Implementation of PCN (Part ... **Who We Are** Applied Materials is the global leader in materials engineering solutions used to produce virtually every new chip and advanced display in the world.… more
    Applied Materials (05/10/25)
    - Save Job - Related Jobs - Block Source
  • Project Engineer - Electromechanical

    ThermoFisher Scientific (Tewksbury, MA)
    … Project management experience + Familiar with Bill of Materials (BOM) and ECO ( Engineering Change Order ) creation + Communicates and works well in ... Project Engineer (Electro-Mechanical) to assist our R&D and Product Optimization Engineering organization. The candidate will support the design and manufacturing of… more
    ThermoFisher Scientific (06/12/25)
    - Save Job - Related Jobs - Block Source
  • Manufacturing Engineer (LP1)

    Advanced Atomization Technologies (Clyde, NY)
    …+ AS13100 Support and Execution + Process / Product Correlation + Process Engineering Change Order process + Metallurgical qualification and compliance ... FOR INTERNAL USE ONLY Position: Manufacturing Engineering Grade: LP1 EEOC Classification: Professionals FLSA Status: Exempt Location: Clyde, NY 14433 About Advanced… more
    Advanced Atomization Technologies (06/01/25)
    - Save Job - Related Jobs - Block Source
  • Manufacturing Engineer (LP2)

    Advanced Atomization Technologies (Clyde, NY)
    …+ AS13100 Support and Execution + Process / Product Correlation + Process Engineering Change Order process + Metallurgical qualification and compliance ... FOR INTERNAL USE ONLY Position: Manufacturing Engineering Grade: LP2 EEOC Classification: Professionals FLSA Status: Exempt Location: Clyde, NY 14433 About Advanced… more
    Advanced Atomization Technologies (05/02/25)
    - Save Job - Related Jobs - Block Source
  • Commodity Management Specialist

    Celestica (Portland, OR)
    …with drawings, schematics, and specifications. Manage change management issues and engineering change order planners. Utilize the Celestica Supplier ... from enterprise resource planning (SAP or Scavenger) and part data viewer change management databases. Audit suppliers' quality management systems. Document End of… more
    Celestica (06/10/25)
    - Save Job - Related Jobs - Block Source
  • Director, Product Line Management - (M6)

    Applied Materials (Santa Clara, CA)
    change management (PCM) and control. + Unreleased product approval and control + ECO ( Engineering Change Order ) approval + Implementation of PCN (Part ... **Who We Are** Applied Materials is the global leader in materials engineering solutions used to produce virtually every new chip and advanced display in the world.… more
    Applied Materials (05/10/25)
    - Save Job - Related Jobs - Block Source
  • Product Management Engineer

    Emerson (Houston, TX)
    engineering teams, to submit/drive EWR ( Engineering Work Request) or ECR ( Engineering Change Order requests) for qualified customer requests. 4. ... and ordering tools, etc. 2. Work with integrated marketing, technical writing, engineering team, to build, update, and maintain product portal, and collateral… more
    Emerson (05/15/25)
    - Save Job - Related Jobs - Block Source
  • Procurement Specialist III

    IGT (West Greenwich, RI)
    …and manage expediting efforts. o Coordinate logistics and clear invoices for payment. 3. Engineering Change Order (ECO) Management: o Distribute ECO updates ... Update SAP info records and maintain cost and purchase order accuracy. 4. BOND Purchase Order Creation...quantities. 5. Last Time Buy Execution: o Collaborate with engineering , product management, and suppliers to facilitate final component… more
    IGT (05/23/25)
    - Save Job - Related Jobs - Block Source
  • Manufacturing Engineer

    TAD PGS, Inc. (Boxborough, MA)
    …drive to the root caus e/c orrective action for any escapes. + Support the Engineering Change Order (ECO) system from generation through implementation. + ... and other activities by reducing/eliminating non-value-added activities. + Provide feedback to engineering on new designs with a focus on ensuring Design for… more
    TAD PGS, Inc. (06/13/25)
    - Save Job - Related Jobs - Block Source
  • Electrical Engineer II

    US Tech Solutions (Foxboro, MA)
    …designs versus sending parts back to vendors. + Attend regular team meetings, including engineering change order meetings in support of manufacturing & ... and correction of manufacturing defects. + Work collaboratively with other engineering resources, project management, purchasing etc. and assist in applying core… more
    US Tech Solutions (04/22/25)
    - Save Job - Related Jobs - Block Source
  • Manager, Ford Pro Charging, Inventory…

    Ford Motor Company (Dearborn, MI)
    …Operations in the Engineering Change Board to review and approval for Engineering Change Requests and Order for EVSE products** + Drive operations ... of something bigger than ourselves. Are you ready to change the way the world moves? Ford Pro is...this position ** Your primary role is to manage order -to-cash operations, including demand planning, asset management, fulfillment logistics,… more
    Ford Motor Company (06/10/25)
    - Save Job - Related Jobs - Block Source
  • Sr Program Director Construction…

    New York Power Authority (Massena, NY)
    …with approved health and safety plans. + Oversee management of field changes with Change Order and Engineering procedures, ensuring systematic approvals. + ... Sr Program Director Construction Engineering Location: White Plains, USGilboa, USHoltsville, USLewiston, NY, US, 14092Astoria, USMassena, USMassena, US **Summary**… more
    New York Power Authority (05/23/25)
    - Save Job - Related Jobs - Block Source
  • Quality Assurance

    Aerotek (Wichita, KS)
    …work order progress using shop schedules and Expedite Report. + Manage any Engineering Change Order (ECO) activities as directed, including pulling work ... department. **Responsibilities** + Interact with shop floor personnel to support order fulfillment. + Assist in scheduling and prioritizing workflow according to… more
    Aerotek (06/11/25)
    - Save Job - Related Jobs - Block Source