• Crane Aerospace & Electronics (Burbank, CA)
    Materials Planner I: Hourly Rate: $34.36/hr. - 40.74/hr._** **_Production Materials Planner II : Salary Range: $83,700 - $99,600_** Several factors ... **Job Summary:** Under direction, the Production Planner I/ II is...and materials to support the established MRP production schedule. The Production Planner more
    DirectEmployers Association (11/05/25)
    - Save Job - Related Jobs - Block Source
  • Supply Chain Planner (Starship)

    SpaceX (Hawthorne, CA)
    …to achieve production goals. Some of the functions a supply chain planner will be responsible for include material requirements planning, change management ... design group + Maintain accuracy and audit bill of materials in MRP systems in preparation for production...of the following: + Engineering + Master scheduling + Material or production planning + Operations or… more
    SpaceX (11/14/25)
    - Save Job - Related Jobs - Block Source
  • Sr. Supply Chain Planner (Falcon & Dragon)

    SpaceX (Hawthorne, CA)
    …achieve production goals. Some of the functions a supply chain planner will be responsible for include material requirements planning, purchasing, supplier ... Sr. Supply Chain Planner (Falcon & Dragon) Hawthorne, CA Apply SpaceX...following: + Engineering + Purchasing + Contract negotiation + Material or production planning + Operations or… more
    SpaceX (11/11/25)
    - Save Job - Related Jobs - Block Source
  • Supply Chain Planning Manager (Raptor)

    SpaceX (Hawthorne, CA)
    …achieve production goals. Some of the functions a supply chain planner will be responsible for include material requirements planning, purchasing, supplier ... to ensure continuity of supply (COS) with the right materials driving plan in place and on time delivery...following: + Engineering + Purchasing + Contract negotiation + Material or production planning + Operations or… more
    SpaceX (11/14/25)
    - Save Job - Related Jobs - Block Source