• Manager, Engineering

    Tecomet (Bristol, PA)
    …full production and on-going support. + Responsible for site change control system, including Engineering Change Order and Process Change Order ... **MANAGER, ENGINEERING ** The Engineering Manager reports to...welding, and CNC machining. We are looking for a change maker. **Principle Responsibilities** + Serves as a member… more
    Tecomet (04/23/25)
    - Save Job - Related Jobs - Block Source
  • Engineering Manager

    Actalent (St. Louis, MO)
    …overall system performance specifications. + Complete all ERP, final design package, Engineering Change Order releases, and end-of-line testing updates ... Job Title: Engineering ManagerJob Description This position is responsible for...a 'Technical Lead' for certain projects. Essential Skills + Engineering management + Mechanical design + New product development… more
    Actalent (04/19/25)
    - Save Job - Related Jobs - Block Source
  • SOC/ASIC Timing Signoff & Front-End Implementation…

    SpaceX (Irvine, CA)
    …at multi-corner and multi-mode environments + Develop/support signoff STA timing/power optimization engineering change order flows (Timing ECOs) and ... SOC/ASIC Timing Signoff & Front-End Implementation Engineer (Silicon Engineering ) Irvine, CA Apply SpaceX was founded under the belief that a future where humanity… more
    SpaceX (04/15/25)
    - Save Job - Related Jobs - Block Source
  • Senior Laser Development Engineer…

    Teledyne (Bozeman, MT)
    …Product Introduction Process + Oversee Configuration Management System + Familiar with standard Engineering Change Order Processes + Develop and mentor ... design trades and analyses on development projects. Some mechanical engineering skills required, relating to military-grade opto-mechanical systems. **Duties and… more
    Teledyne (03/04/25)
    - Save Job - Related Jobs - Block Source
  • New Product Introduction Coordinator

    Advanced Energy (Wilmington, MA)
    …are expeditiously advised of changes to materials + Work implementation dates on ECO ( Engineering Change Order ) to meet design needs and minimize scrapping ... create and maintain Bill of Material (BOMs) + Process Change Orders in the ERP (Enterprise Resource Planning) system...Order ) to drive demand on the factories for Engineering evaluation units + Support DE (Design Engineering more
    Advanced Energy (03/06/25)
    - Save Job - Related Jobs - Block Source
  • Manager V, Product Line Management - (M5)

    Applied Materials (Santa Clara, CA)
    change management (PCM) and control** + Unreleased product approval and control + ECO ( Engineering Change Order ) approval + Implementation of PCN (Part ... **Who We Are** Applied Materials is the global leader in materials engineering solutions used to produce virtually every new chip and advanced display in the world.… more
    Applied Materials (03/04/25)
    - Save Job - Related Jobs - Block Source
  • Senior Mechanical Engineer

    Emerson (Houston, TX)
    …Responsibilities Will Be:** + Drive product enhancements and design modifications, leading the Engineering Change Order (ECO) process with precision. + Apply ... for innovation. In this role, you will lead product enhancements, optimize engineering solutions, and collaborate across teams to ensure technical excellence. This… more
    Emerson (04/22/25)
    - Save Job - Related Jobs - Block Source
  • Cost Engineer

    Parker Hannifin Corporation (Woburn, MA)
    …item masters for new products and maintain item masters for existing products. + Ensure Engineering Change Order and Management of Change processes have ... Location : Woburn, MA, United States Job Family : Engineering Job Type : Regular Posted : Mar 7,...optical products. We offer a worldwide network of applications engineering support, manufacturing facilities, and sales offices. With stocking… more
    Parker Hannifin Corporation (03/08/25)
    - Save Job - Related Jobs - Block Source
  • Manufacturing Engineer (LP1)

    Advanced Atomization Technologies (Clyde, NY)
    …+ AS13100 Support and Execution + Process / Product Correlation + Process Engineering Change Order process + Metallurgical qualification and compliance ... FOR INTERNAL USE ONLY Position: Manufacturing Engineering Grade: LP1 EEOC Classification: Professionals FLSA Status: Exempt Location: Clyde, NY 14433 About Advanced… more
    Advanced Atomization Technologies (04/20/25)
    - Save Job - Related Jobs - Block Source
  • Product Line Management NCG - New College Graduate

    Applied Materials (Santa Clara, CA)
    …one or more fo the following:** + Unreleased product approval and control + ECO ( Engineering Change Order ) approval + Implementation of PCN (Part Change ... **Who We Are** Applied Materials is the global leader in materials engineering solutions used to produce virtually every new chip and advanced display in the world.… more
    Applied Materials (04/12/25)
    - Save Job - Related Jobs - Block Source
  • Director, Product Line Management - (M6)

    Applied Materials (Santa Clara, CA)
    change management (PCM) and control. + Unreleased product approval and control + ECO ( Engineering Change Order ) approval + Implementation of PCN (Part ... **Who We Are** Applied Materials is the global leader in materials engineering solutions used to produce virtually every new chip and advanced display in the world.… more
    Applied Materials (03/29/25)
    - Save Job - Related Jobs - Block Source
  • Commodity Management Specialist

    Celestica (Portland, OR)
    …with drawings, schematics, and specifications. Manage change management issues and engineering change order planners. Utilize the Celestica Supplier ... from enterprise resource planning (SAP or Scavenger) and part data viewer change management databases. Audit suppliers' quality management systems. Document End of… more
    Celestica (03/11/25)
    - Save Job - Related Jobs - Block Source
  • Cost Engineer

    Parker Hannifin Corporation (Woburn, MA)
    …item masters for new products and maintain item masters for existing products. + Ensure Engineering Change Order and Management of Change processes have ... Location : Woburn, MA, United States Job Family : Engineering Job Type : Regular Posted : Jan 28,...optical products. We offer a worldwide network of applications engineering support, manufacturing facilities, and sales offices. With stocking… more
    Parker Hannifin Corporation (04/29/25)
    - Save Job - Related Jobs - Block Source
  • Manufacturing Engineer

    Fortive Corporation (Boxborough, MA)
    …cost improvements on both sustaining and new production cells. + Support the Engineering Change Order (ECO) system from generation through implementation. ... and other activities by reducing/eliminating non-value-added activities. + Provide feedback to engineering on new designs with a focus on ensuring Design for… more
    Fortive Corporation (03/15/25)
    - Save Job - Related Jobs - Block Source
  • Electrical Engineer II

    US Tech Solutions (Foxboro, MA)
    …designs versus sending parts back to vendors. + Attend regular team meetings, including engineering change order meetings in support of manufacturing & ... and correction of manufacturing defects. + Work collaboratively with other engineering resources, project management, purchasing etc. and assist in applying core… more
    US Tech Solutions (04/22/25)
    - Save Job - Related Jobs - Block Source
  • Application Engineer

    Fairbanks Morse Defense (Salem, OH)
    …and customer and market development (eg, trade events). * Manage configurations through the Engineering Change Order process by releasing part numbers, bills ... within the proposal development process and collaborate with commercial management, engineering , procurement, and field service to develop proposals and future FM… more
    Fairbanks Morse Defense (04/13/25)
    - Save Job - Related Jobs - Block Source
  • Maintenance Mechanic

    Aerotek (Totowa, NJ)
    …Logs, Welding coupons, and testing. + Support weld equipment maintenance. + Support Engineering Change Order implementation by conducting operator training ... Description** As a member of the Quality and Production Engineering team, the Production Engineering Technician provides...classification and length of employment. Benefits are subject to change and may be subject to specific elections, plan,… more
    Aerotek (04/28/25)
    - Save Job - Related Jobs - Block Source
  • Sr Program Director Construction…

    New York Power Authority (Holtsville, NY)
    …with approved health and safety plans. + Oversee management of field changes with Change Order and Engineering procedures, ensuring systematic approvals. + ... Sr Program Director Construction Engineering Location: White Plains, USGilboa, USHoltsville, USLewiston, NY, US, 14092Astoria, USMassena, USMassena, US **Summary**… more
    New York Power Authority (04/11/25)
    - Save Job - Related Jobs - Block Source
  • Production Planner

    The Gleason Works (Rochester, NY)
    …with demand management plans, including lot-sizing and safety stock analysis + Support Engineering Change Order implementation. + Support Machine Assembly & ... will support the fulfillment of manufacturing, assembly or sales order demands. Participate in business projects and initiate process...between the employer and employee and is subject to change by the Company as the needs of the… more
    The Gleason Works (03/26/25)
    - Save Job - Related Jobs - Block Source
  • Production Planner

    Kelly Services (Milpitas, CA)
    …of materials; plan and reserve for EOL (End of Life) support. + ECO ( Engineering Change Order ) review and implementation, work with Engineering ... includes but not limited to purchasing, manufacturing planning, repair depot, engineering , quality, regulatory, customer service and document control. + Set target… more
    Kelly Services (04/10/25)
    - Save Job - Related Jobs - Block Source