- Catalent Pharma Solutions (Harmans, MD)
- The ** Finite Scheduler ** will convert our weekly master production plan into a day-to-day manufacturing schedule that reflects both the unique demands of ... therapies and the realities of our fast-paced GMP environment. The Finite Scheduler reports to the Senior Manager, Production Scheduling. Catalent, Inc. is… more
- Pfizer (Sanford, NC)
- …making a significant impact on global health. **Position Overview** The senior finite scheduler will create, optimize and maintain daily and short-term ... production schedules across the production area. The daily schedule will drill down to the equipment/asset level and enable a seamless operation on the shop floor. Scope of daily schedule includes all production, validation, tech transfer, maintenance… more
- Catalent Pharma Solutions (Greendale, IN)
- **Master Scheduler ** **Position Summary** Catalent, Inc. is a leading global contract development and manufacturing organization (CDMO) whose mission is to develop, ... services to solve difficult development and manufacturing challenges. The **Master Scheduler ** is responsible for creating and managing the Master Production… more
- GKN Automotive (Alamance, NC)
- …Lines. Ensure that MPS: Is feasible and balanced against resource finite /demonstrated capacity, Includes all phase-in/out, localization and transfer plans as well ... as new programmes development/prototyping, Is based on SIOP agreed working calendar and includes all planned downtime (Holiday, routine maintenance, Line closures, etc.), Is in line with Supplier/Subcontractor available supply capacity, GKN Driveline provides… more