- NextEra Energy (Parrish, FL)
- ** Production Specialist I& C - Plant Manatee** **Date:** Jul 12, 2025 **Location(s):** Parrish, FL, US, 34219 **Company:** NextEra Energy Florida Power & ... This position is based on our Operations team at Plant Manatee in Parrish, FL. This position will be...hold, the operator "A", or turbine operator position, or Production Tech-I or equivalent. 3. If there are no… more
- TECO Energy (Tampa, FL)
- …load forecast for next hour. 2. Dispatch available generation resources to minimize production cost and maintain security of the power system. 3. Ensure rapid ... Degree with a minimum of one year of power plant or transmission/substation/distribution experience; 2. Minimum of two years...experience, working the Control Room, as a Combined Cycle Specialist or an IGCC Process Specialist ; 6.… more